Stage of construction as of May 12, 2009
1

Stage of construction as of May 12, 2009

The project of cottage town “Dolche Vita” provides for construction of 20 townhouses which are split into 4 blocks (5 townhouses in each block). It is planned to put blocks #2 and # 4  into operation by the end of 2009.
Currently the following works connected with construction of block # 2 are being done:
- brickwork for the five sections of the second floor are done;
- floor slabs for the attic are being assembled;
- the works for the basement dampproofing are in the process;
- the headwalls are being installed;
- the sewage system is being set;
As for the construction of block # 4 the following works are being done:
- the headwalls are being installed;
- the basement with slabs for five townhouses is finished;
- the brickwork for the first floor is being in the process;
- the sewage system is being set;
As for the construction of block # 3 the following works are being done:
- the basement construction is being in the process;
- the sewage system is being set.


construction stages
20.11.2010
ACTION! The SPECIAL OFFER
28.05.2009
Our partner company "Îlver"
12.05.2009
Stage of construction as of May 12, 2009
All news
About Infrastructure and engineering General layout Planning Truskavets. Health resort Wealth management Purchasing conditions
© 2009 dolcevita-town.com.ua All rights reserved. Web- site developed and supported by advertising agency "22" /2009
Ðåéòèíã@Mail.ru